Search
Development Fees

Ordinance Description Fee
1044.04m Sewer Tap-in $1500 per equivalent single family home
1044.04b Sewer Inspection - residential and commercial $100 per first 2 hours. City's rate thereafter
1040.01
Water Tap Inside City Outside City
New 3/4" service $385 $423.50
New 1" service $440 $484
New 1 1/2" service $660 $726
New 2" service $770 $847

Water Meter Inside City Outside City
5/8" $140 $154
3/4" $140 $154
1" $170 $187
1 1/2" $330 $363
2" $420 $462
2005-130 Water Inspection $100 per first 2 hours. City's rate thereafter
Numerous Water and Sewer contract line fees and unrecorded assessments Varies, depending on location
2007-07 Water and Sewer tapper licensing fee $10,000 performance bond. $100 per license year.
2005-129 Storm Permit $100 per address
1020.02 Roadway work permit No charge at this time. Possible bond and inspection costs.
1040.03 Geothermal well fee $125 per well plus $25 per year.
1220.06 Planning Commission application $100
1220.05 Special professional services Varies
2006-133 Site plan review fee $100 for residential and 2-family. 1% of site work cost with $100 minimum for others. Copying costs $.25 per copy page. $1.00 per plan sheet.
Subdivisions, Roadway and Utility Extensions
1220.06 Plan review Up to $3000
1242.02 Plat approval $25 minimum, based on number of lots, curved boundaries, etc.
1246.13 Bond, escrow account, of letter of credit 100% of cost of public improvements.
1246.13 Inspection cost City's cost. Minimum 2% of construction. No maximum.
1020.05 Right-of-way vacations Legal filing, Engineering and Finance Director's time.
Industrial Buildings
1044.08c Pretreatment system for any process waste (as designed by applicant's engineer) $200 application fee
1044.09 Pretreatment system monthly charge Revised yearly based on City's costs
1046.10 Extra-strength waste surcharge Revised yearly